How Long Does A Kitchen Renovation Take?

Infinity Kitchens & Cabinets • August 8, 2025

Planning a kitchen renovation but not sure how long it might take? One of the most common questions homeowners ask when starting a project is how much time they’ll need to allow from start to finish. Whether you’re refreshing a dated layout or investing in a full custom build, understanding the timeline can help reduce stress and avoid unexpected delays.


In this blog, we’ll walk through the key phases of a kitchen renovation, discuss the factors that can influence timing, and explain how professional support can help streamline the process. If you're considering a kitchen renovation in Lismore, this guide will help set realistic expectations and prepare you for each step ahead.

Key Phases of a Kitchen Renovation

A successful kitchen renovation typically moves through five main stages. Each step requires time and coordination, especially when custom components like kitchen cabinets are involved.


Planning & Design (2–4 weeks)


The initial planning and design phase includes consultations, site measurements, layout planning, and selecting materials. This stage is crucial to align the renovation with your vision, budget, and functional needs.

Tasks involved:


  • In-home consultation and measure.
  • Preliminary design concepts and layout options.
  • Selection of cabinetry finishes, benchtops, tapware, and splashbacks.
  • Quoting and revisions.


Depending on how quickly decisions are made, this phase may take two to four weeks. Customised designs or special-order materials may extend this timeline slightly.


Ordering Materials & Scheduling (2–6 weeks)


Once the design is finalised, your chosen materials need to be ordered, especially if you're investing in custom kitchen cabinets in Lismore. Lead times for cabinetry, appliances, and fixtures vary depending on supplier availability and manufacturing.

Tasks involved:


  • Final confirmation of design plans.
  • Ordering cabinets, benchtops, and fittings.
  • Coordinating trades and scheduling installation.


During this stage, delays can occur if materials are unavailable or custom cabinetry requires extended manufacturing time. Working with a local provider often helps reduce transport wait times and keeps your project on track.


Demolition & Preparation (3–5 days)


After materials arrive and the schedule is confirmed, the renovation begins with the removal of old fixtures and preparation of the space. This phase can be relatively quick but may reveal hidden issues like outdated wiring or plumbing that need to be addressed.

Tasks involved:


  • Removal of old cabinetry, benchtops, flooring, or tiles.
  • Minor structural changes if needed.
  • Site clean-up and preparation for installation.


A typical demolition phase will take three to five days, depending on the size and condition of the existing kitchen.


Installation of Cabinets & Fittings (1–3 weeks)


This is the most noticeable phase of the renovation, where the new kitchen starts to take shape. Custom kitchen cabinets in Lismore are typically installed first, followed by benchtops, appliances, lighting, and splashbacks.

Tasks involved:


  • Cabinet and drawer installation.
  • Plumbing and electrical rough-ins.
  • Appliance fitting and rangehood installation.
  • Splashback and benchtop installation.


While some projects can be completed in one week, more complex layouts with stone benchtops or integrated appliances may take longer.


Final Touches & Clean-Up (2–4 days)


Once major fittings are in place, finishing touches bring everything together. This includes painting, silicone sealing, lighting adjustments, and a final clean-up.

Tasks involved:


  • Final inspections and adjustments.
  • Touch-up painting and caulking.
  • Clean-up and handover.


This phase can usually be completed in just a few days, depending on the scope of finishing work required.

Total Timeframe for a Kitchen Renovation

So, how long does a typical renovation actually take from beginning to end? Here’s a rough breakdown based on the scale of work:


Basic Renovation (Cosmetic Upgrade):

  • Timeframe: 3–5 weeks
  • Includes: New cabinet doors, handles, splashback, and benchtops.
  • Ideal for: Updating outdated surfaces without structural changes.


Mid-Range Renovation (Partial Rebuild):

  • Timeframe: 5–7 weeks
  • Includes: Custom kitchen cabinets, appliance upgrades, and layout improvements.
  • Ideal for: Families upgrading function and storage with moderate changes.


High-End Renovation (Full Custom Build):

  • Timeframe: 8–10+ weeks
  • Includes: Custom cabinetry, structural changes, electrical reconfigurations, premium materials.
  • Ideal for: Full kitchen transformation with luxury finishes.


What Can Affect Your Renovation Timeline?

While the average renovation takes between 4 and 8 weeks, several factors may speed up or delay the process.


Custom Cabinetry Lead Times

Custom kitchen cabinets in Lismore may have longer lead times than off-the-shelf options. The manufacturing schedule, design complexity, and supply chain availability all play a role.


Material Selections

Choosing imported or specialised finishes—like natural stone benchtops or glass splashbacks—can add time to both ordering and installation.


Scope of Electrical & Plumbing Work

If the renovation involves moving sinks, ovens, or lighting, this may require more time for licensed trade work and inspections.


Permit or Council Requirements

Some large-scale renovations require permits, especially if structural changes or new plumbing lines are involved. Allow extra time for approvals when planning.


Unforeseen Issues

Older homes may present surprises during demolition, such as asbestos, rotten framing, or outdated wiring. Having a contingency budget and timeline can help manage these situations calmly.

Why Professional Planning Matters

Working with a professional kitchen renovation team can make a major difference in maintaining timelines and reducing delays. A qualified team will:


  • Offer realistic timeframes based on your specific layout and goals.
  • Coordinate all trades to avoid scheduling conflicts.
  • Help you make informed decisions early to avoid redesigns mid-project.
  • Manage any unexpected delays with minimal disruption to your household.


In particular, engaging a local provider of kitchen cabinets in Lismore means faster communication, easier coordination, and better knowledge of suppliers and trades.

Tips to Keep Your Project on Track

Want to keep your renovation running smoothly? Here are a few practical tips:


  • Lock in decisions early. Choosing cabinetry, appliances, and finishes upfront helps avoid redesign delays.
  • Use one team where possible. Coordinating trades through a single provider streamlines communication.
  • Be flexible. Delays can happen. Having a buffer in your schedule helps reduce stress.
  • Stay involved. Regular updates and communication with your renovator help identify issues early.
  • Budget realistically. Unexpected expenses can delay timelines. A 10–15% contingency is recommended.

Start Planning Your Kitchen Renovation in Lismore Today

A kitchen renovation is a rewarding investment, but it does take time to do well. Whether you're planning a basic cosmetic update or a full custom fit-out, understanding the timeline and key phases helps avoid surprises and sets realistic expectations.